+39 0474 563 333 // [email protected]

Rubner Haus Experience

Ready for you to move into

The second finishing stage in our range of services includes the house that is ready to move into. This means that we install the prefabricated wooden house on the foundation slab (not included in the delivery here) within the shortest possible period of time, and we complete all necessary internal finishing work, such as wiring systems, plumbing fixtures and laying of the tiles and floors. You receive the keys to your new Rubner Haus once all the work has been completed on our side. You just need the kitchen and some furniture and then you really are ready to move in.

The including
services

Finishing stage Experience

All services included in Basic
  • all walls and roof
  • windows and house door
Other included services
  • internal doors
  • wallpaper and painting works
  • complete wiring systems
  • complete ventilation system
  • solar system, photovoltaics
  • ceiling panels inside
  • ducts or wiring
  • underfloors and floor covering
  • complete heating system
  • etc.

Rubner Haus Boutique

The right selection of materials

The furnishing and plumbing fixtures for your prefabricated wood house are selected in our Finishings department. An expert Rubner Haus consultant spends a whole two days accompanying you through the Design department in Chienes, South Tyrol, in order to make the best selection for your new house in line with your requests. Numerous products and options are available to you here that have one thing in common: they have all been strictly tested by Rubner to verify their quality and functionality.

Find out more

Other finishing stages

Explore more services

Montaggio di una casa a telaio

Basic

Villa prefabbricata con piscina

Studio